As of October 2026
What's new, and what this page will not pretend
| Item | Status | Source |
|---|---|---|
| CCNP Collaboration v2.0 testing starts 3 February 2026. v1.2 testing ended 2 February 2026. The blog describes a 50/50 cloud and on-premises split. | Verified against Cisco's learning blog | Cisco learning blog |
| 350-801 CLCOR remains the 120-minute core. 300-815 CLACC v2.0 is the on-premises call-control concentration. 300-820 is published there as CLHCT, hybrid and cloud. 300-830 CLCCE is introduced as the cloud customer-experience concentration. | Verified against that blog and the CLCOR and CLACC pages linked from the certifications page | Blog |
| The CUCM Release 15 system configuration book's revision history includes a February 5, 2026 note about NSE-based fax or passthrough for secure SIP lines. | Verified against the public book text retrieved for this lab | System configuration guide |
| Port numbers in the firewall matrix match the Release 15 port chapter retrieved for this lab, including 8090 for gateway recording and 443 for Smart Licensing to CSSM. | Verified against that chapter | Port chapter |
| Webex Calling commercial SKU names and prices for October 2026. | Unverified here. Read Control Hub help before you quote a SKU. | Webex help |
| The current Microsoft collaboration exam code. | Unverified here. The certifications page refuses to freeze a code this build did not re-check. | Teams Phone |
| Any "2026 feature" that is not in the rows above. | Unverified. Do not treat this lab as a product roadmap. | None |