ZTA LabFree University

T12 · T12-R36 · Licensing and roadmap

Roadmap, timelines, and the check date

Timelines in a study lab rot. The honest timeline is the date you opened the page. Write last checked 2026-10 on every source row. When a page carries its own date, copy that date and say what it dates: a markdown file, or a registry.

Learn it in 5 minutes

  • Every citation in this lab was checked in October 2026.
  • Talkdesk's authentication page shows updatedAt 2026-09-10.
  • IANA's SIP parameters page shows Last Updated 2026-08-17.
  • No vendor roadmap with quarters was opened.
  • A retired label on Zoom's API page is a naming change, not a roadmap.

Visual

Roadmap, timelines, and the check date Dates. Teaching sketch. Confirm a live system. 2026-08-17 2026-09-10 2026-10 No Gantt Names come from pages opened in 2026-10. A missing name stays confirm.

Count the boxes: 4. Each label is a name from a page or a study label marked on the drawing.

Flow

Roadmap, timelines, and the check date Caller SIP Called session setup session setup RTP, not required to hairpin Teaching sketch from RFC 3261 and RFC 3550. Not a packet capture.

What is going on

Timelines in a study lab rot. The honest timeline is the date you opened the page. Write last checked 2026-10 on every source row. When a page carries its own date, copy that date and say what it dates: a markdown file, or a registry.

Roadmap slides with quarters, end of support, and hardware generations were not opened. The ecosystem future-hooks drawing uses vendor sentences and confirm stickers, not a Gantt chart.

If you add a date later, open the page again. Do not extend October 2026 by guessing.

Worked example

A vertical line labeled 2026-10, with three pins: IANA registry date, Talkdesk auth file date, and your lab check. Title it dates we read, not a product roadmap.

Quiz

1. This lab's source rows use last checked 2026-10.

2. Zoom published a quarter-by-quarter roadmap on the pages opened here.

Ecosystem

Sister pieces sit on the ecosystem page: the glossary, the mind map, the integration map, and the bridges.

  • Last checked — The month this lab opened the page. Here, 2026-10.
  • updatedAt — A date in Talkdesk's markdown front matter. Not automatically a product release.

Config. Put last checked next to every external link.

Troubleshooting. A teammate quoting a roadmap quarter from this site is quoting a date the site does not have. Send them to confirm.

Bridge. Future hooks on the ecosystem page are the place for vendor sentences that are not schedules.

Mind map, sister technologies, and future hooks live on the ecosystem page.

Sources and go deeper

Opened 2026-10. A row marked confirm has no link, because that page was not verified.

sources.json Markdown